Closure of Back lane from 14.05.18

tRIIO are requiring to install a new gas connection on the above road. To undertake this work safely will require that the road is closed for up to five days from the 14th May 2018. To reduce the impact of the closure Anglian Water will also be undertaking a connection at the same time.

A plan showing the closure can be viewed here https://roadworks.org?tm=105570893

Posted: Mon, 30 Apr 2018 19:19 by Lisa Ritchie

Tags: News